Site: Home > Home > News and events

Gas tightness testing of desulfurization test equipment

2024-01-19 14:43

Before using the Zhiyan complex iron desulfurization test device, it is also important to check the airtightness of the test device in order to conduct the experiment safely. The airtightness inspection mainly includes the following two points.

Pressure testing

Inject water into the R201 absorption tower with a pump and maintain the pressure at 0.2Mpa for 20-30 minutes. Thoroughly inspect the equipment and pipelines for cracks and water leakage. If there are no such phenomena and the pressure gauge pointer does not drop, the pressure test is qualified.

Leakage testing

Use compressed air to increase the system pressure to 0.2MPa, and then check the sealing of the equipment pipelines. A leakage rate of less than 0.2% within 24 hours is considered qualified. (Purging work can be carried out simultaneously with pressure and leakage testing)


Related News

2024-01-19How to test the performance of coatings
2024-01-19Gas tightness testing of desulfurization test equipment
2024-01-18Errors in physical and chemical experiments
2024-01-18Blank test and spiked recovery rate
2024-01-18Physical and chemical analysis experiments
2024-01-18Performance testing of polymer materials
2024-01-18Environmental air detection
2024-01-18Common problems with chromatography in experiments
2024-01-18Lithography technology for chips
2024-01-18Photocathode technology for photomultiplier tubes

Copyright 2022:Qinsun Instruments Co., Limited

High-end textile tester supplier  Email:info@qinsun-lab.com | Textile Testing Equipment pdf | Tel:021-67800179 |